Customization: | Available |
---|---|
First Moisture: | 30% ~40% |
Final Moisture: | 8%~15% |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1 Introduction
Lignite is the youngest coal in the latest forming solid fossil fuels. It has high explosibility and flammability due to its high volatile; it has low heating capacity and fixed coal content due to its high moisture, which is generally up to 40% and very difficult to remove. Moderate ash content and high tar content make it very necessary to take desulfurization system into considerate during the drying process.
Large coal mines of China that produces lignite have been found mainly in Inner Mongolia. In order to develop lignite utilization, we have carried out comprehensive cooperation with Datang International Group, Datang International Chemical Company, Datang International Chemical Engineering Design Institute, Hebei Electric Power University, Beijing State Power Design Institute (formerly Hebei Electric Power Design and Research Institute) and so on. At the same time, we have signed 500 tons / year lignite drying process line contract.
Pay attention to the following requirements during the lignite drying process:
The lignite has high tar content and its moisture was composed by internal water and external water. So during lignite drying process, it needs an installation of chiller in the outlet of the lignite at the end of the lignite rotary dryer. In this case, we can achieve security storage, to be packaged and transported.
To sum up, lignite drying is different from drying other materials, which should be paid special attention! We must not build lignite drying process line with conventional means.
2. Block diagram of the new lignite drying process line (downstream process):
Target: